top of page

CONSTRUCTION

Client:

AWTAD AL ARABIA TRADING & CONTRACTING EST. 

 

Project:

Corniche Towers 

Location: 

Corniche - Jeddah

Year:

January 2020 - Present

Scope: 

Design and load calculation study for cup-lock scaffolding for slabs of total area 15000m2

Client:

AL SAGHIR

Project:

King Avenue Mall

Location: 

Obhur - Jeddah

Year:

November 2019 - Present

Scope: 

Design and load calculation study for cup-lock scaffolding for slabs of total area 100,000 m2

Client:

AL SAWADI CONSTRUCTION Co.

Project:

Madinah Road Hotel

Location: 

Madinah Road - Jeddah 

Year:

September 2019 

Scope: 

Design and load calculation study for cup-lock scaffolding for slab of total area 4000m2 and 4 elevations of total area 10000m2

Client:

NESMA TRADING Co. 

Project:

AL ZAHID BUSINESS PARK

Location: 

Al Rehaily - Jeddah 

Year:

September 2019 - Present 

Scope: 

Design and load calculation study for cup-lock scaffolding for slabs of total area 7000m2

Client:

OCC WEAVERS Ltd.

Project:

Rawdah Towers

Location: 

Khalidiyah - Jeddah

Year:

March 2019 

Scope: 

Design of light-weight wall and column forms of area  3600 m2 including the load calculation study, training for workers and supervision on casting of walls and columns. 

Client:

OHL/COPASA/IMATHIA Consortium

Project:

Haramain High-Speed Railway - Operation Control Center Building 

Location: 

Jeddah Haramain High Speed Railway Station 

Year:

August  2018 - February 2019 

Scope: 

Design, installation & dismantle of cup-lock scaffolding on all elevations with platforms every 2m high for installation of curtain wall.

Total elevations area= 2700m2

Client:

FREYSSINET SAUDI ARABIA

Project:

Haramain High Speed Rail Airport East Interchange

Location: 

King AbdulAziz Airport - Jeddah  

Year:

March 2016 - September 2016 

Scope: 

Design and load calculation study for cup-lock scaffolding for bridges of total length 4000m

Client:

Irfan Co.

Project:

Clock Royal Tower Elevators

Location: 

Clock Tower - Makkah

Year:

October  2015 

Scope: 

Manufacture of customized cup-lock system with pipe thickness of 4mm due to stand the load in long height in shafts total volume 50000 m3

Client:

FREYSSINET SAUDI ARABIA

Project:

Headquarters Business Park

Location: 

Corniche - Jeddah

Year:

September  2010 

Scope: 

Design and load calculation of cup-lock scaffolding for 60 slabs of total area 200,000 m2

Client:

Al Muhaideb 

Project:

King Abdulaziz University 

Location: 

Jeddah 

Year:

October 1995 

Scope: 

Design and load calculation study ofor cup-lock scaffolding for auditoriums and slabs of total area 150000 m2

bottom of page